In an assembly project, the initial time we recorded was approximately 90 minutes per unit. When we designed and tested an SPS kitting trolley that brought parts together in assembly sequence, this fell to 55 minutes. We then examined walking, reaching, bending, searching for parts and material handling movements individually.

After improving these movements, trials reached approximately 35 minutes per unit. We also identified opportunities in product design to make assembly easier. These times are measurements from that project; operator labour, station cycle time and total throughput time are different concepts.

And we achieved this without making the operator work faster.
On the contrary, through:
– Less movement
– Less fatigue
– Better ergonomics

Initial output was 5–6 units per day. Trials indicated potential for 15 units per day; 18 units per day was our future target with product development work. These should not be presented as sustained production results.

To compare 35 minutes per unit with daily output, we need to know net working time, parallel stations and product scope. For example, at one sequential station, 15 units × 35 minutes = 525 minutes. This calculation alone does not show that the same result will occur on every shift.

But then we encountered an important reality. (A classic problem.)
Actual shop-floor production could not exceed 7–8 units per day.

Why?
Because the assembly process had become faster, but material flow had not…
– The right part
– At the right time
– In the right quantity
was not available in front of the operator.

Material waiting and problems lengthened work the operator could perform in 35 minutes.

This project showed us once again:

Perfecting a process is not the same as perfecting the value stream.
You can reduce assembly time from 90 minutes to 35 minutes or even less.

But if procurement, the material supermarket, Kanban, kitting and line feeding do not support that pace, we cannot turn all the released capacity into actual output.

Alongside “How can we improve this operation?” we should ask: “Where does the product wait on its journey to meeting the customer’s need?”

Because:
Fast Process + Poor Flow = Low Output
Good Process + Good Flow = Real Capacity

This article on LinkedIn

View the original LinkedIn post →

Related Articles

Let’s talk by phone

Cezmi Aytekin · Yalın Dönüşüm

Open the calling app

If your computer has no calling app, you can call this number from your phone.

Dil
Türkçe TR English EN Deutsch DE Русский RU Қазақша KK O‘zbekcha UZ

↗ Google Translate · Otomatik çeviri